You must be logged in and verified to contact the designer.
Product Description
This is the embankement end for the NW corner of the Triple Underpass. This is NOT prototypical. The prototype was built on a 60 degree slope but for HO modeling this model was built on a 45 degree slope. All of the other design elements remain prototypical.