You must be logged in and verified to contact the designer.
Product Description
This is an updated, more detailed replacement part for the bridge part in Round2's 1/350 TOS Enterprise. It is modified so that the turbo lift is in the exact rear center of the bridge, allowing the view screen to face forward while the lift aligns with the external shaft. The Communication Station has been rotated toward port next to Engineering.
This is the way the bridge was originally imagined before the lift was moved off center for dramatic and photographic reasons. This bridge comes with the floor attached with sprues for easy disconnection, painting, and detailing.
We're sorry to inform you that we no longer support this browser and can't confirm that everything will work as expected. For the best Shapeways experience, please use one of the following browsers: